The Varigence company brand logo
Products
BimlFlexBimlStudioBimlExpress
Pricing
Solutions
IndustriesUse Cases
Resources
DocumentationKnowledge BaseBlog
About
CompanyContact Us
Products
BimlFlexBimlStudioBimlExpress
Pricing
Solutions
IndustriesUse Cases
Resources
DocumentationKnowledge BaseBlog
About
CompanyContact Us
Schedule Demo
Account
Schedule Demo
Account

BimlFlex Projects define exactly how data is intended to be processed, through which steps in the architecture, and by using what technology.

The project configuration includes the specification of the involved Connections, for example as a source or target connection. The exact configuration of these stages drives the way the data logistics are generated by the BimlFlex engine. In other words, a project directs how data is processed through the data solution.

Project Connections

Each project requires an Integration Template, which specifies for which target technology the data logistics processes will be generated. A project is also associated to a Batch to generate a batch process executable for the targeted technology (integration template).

Project Integration Template

All Objects belonging to the connections configured in the project will be subject to the selected integration template. This means that, for example, if you use a connection as a source that data logistics will be generated for all objects associated with this (source) connection.

Projects are created and edited using the Project Editor in the BimlFlex Application.

In the BimlFlex design workflow, a project is typically the third component to configure - after having created the connections and batch to reference the project to.

At this stage, depending on the project configuration and assuming objects have been imported for the source connection, executable data logistics can already be generated for a number of patterns.

© Varigence